01 - Overview
What We Actually Do
Carda Electrics handles the electrical side of residential heating and cooling. That means the supply, the protection and the controls: a dedicated circuit run back to the board, the right breaker and safety switch on it, an isolator where the standards require one, and the wiring for whatever controls the unit uses.
For a split system, an ARC-licensed refrigeration technician handles the gas side and we handle the electrical side. We’ll tell you plainly which parts of a job are ours, so nobody turns up expecting the other trade to have already been.
For everything that runs on power alone - panel heaters, hardwired bathroom heat lamps, ceiling fans, exhaust fans, hydronic controls and thermostats - the whole job is ours.
The short version
- Dedicated circuits, breakers and safety switches for new heating or cooling
- Isolators fitted to the standard, not left off to save a fitting
- Panel heaters, heat lamps, ceiling fans and exhaust fans, start to finish
- Thermostats, timers and controls wired and tested
- An honest read on whether the switchboard can carry what you're adding

02 - What's included
Everything We Cover on the Job
New Circuits and Supply
A dedicated circuit back to the switchboard, sized for the unit rather than for whatever was nearest. With the correct breaker and RCD protection on it.
Isolators and Switching
An accessible isolator where the wiring rules require one, so the unit can be worked on safely later without killing power to half the house.
Controls and Thermostats
Wiring and commissioning for thermostats, timers, wall controllers and smart controls, including the cable runs behind them.
Hardwired Heating
Panel heaters, bathroom heat lamps and hardwired strip heaters installed and tested, including the exhaust side of a three-in-one.
Fans and Ventilation
Ceiling fans, exhaust fans and ducted roof fans - mounted properly, on a circuit that can take them, and quiet when they run.
Switchboard Capacity
A look at what the board can actually carry before you add load to it. If it needs an upgrade first, you'll hear that before you've spent money on the unit.
03 - Why it matters
Why the Switchboard Comes First
A reverse-cycle system, an induction cooktop and a car charger are all things Australian houses have added in the last decade, and a lot of them are running on a board designed before any of those existed. Adding load to a board that’s already at its limit doesn’t fail politely. It nuisance-trips for a year and then it doesn’t.
Under AS/NZS 3000 the protection has to suit the load, which means new heating or cooling is one of the few times anyone looks at the board properly. It’s the cheapest moment to fix it, because the electrician is already there.
‘I'd rather tell you your board needs doing before you've bought the unit than after we've tried to connect it.’
Peter, licensed electrician & owner
Sources AS/NZS 3000Energy Safe Victoria



